The vessel is 49 metres in length and twelve metres at the beam. It is powered by twin engines each delivering 1,200kW. The vessel will be equipped with advanced navigation and control systems. ‘Algosaibi 51’ is expected to be delivered two months prior to the contract deadline after the completion of its outfitting.
Read More
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment